Your SCADA shows the data.
Ours shows what to do with it.
Real-time solar monitoring: actual vs expected generation, curtailment and energy availability. This is not sensor reading, it is reading for decisions.
Book a SCADA demo →Real time is the bottom layer.
The decision lives above it.
A supervisory system answers what is happening right now. The performance management layer answers how the period went and why, with history structured into management indicators. Different questions, asked by different people, on the same platform.
The operations centre, right now
- Instant power and the day curve against irradiance
- Active alarms ranked by generation loss
- Communication availability per device
- Inverters and strings outside their neighbours' range
Whoever plans maintenance and answers for the month
- Period performance ratio, per IEC 61724-1
- Capacity factor per plant and per skid
- Loss disaggregation cascade down to the costliest asset
- Yield compared across inverters in the same group
- Unavailability split into internal and external
Whoever answers for the portfolio
- Energy generated against the cycle target
- Consolidated energy availability across the portfolio
- Plants ranked by generation deviation
- Month over month trend of PR and capacity factor
The same data, read at three altitudes. None of these indicators is typed in.
From dashboard to equipment, in one flow.
Product screen structure, with anonymized data.
Performance dashboard, balance of plant and string analytics.
Total power
4.572kW
Energia hoje
15,46MWh
PR · IEC 61724-1
79,5%
87.4% temp. corrected
Availability
96,4%
POA irradiance
1.097W/m²
Active alarms
3
▼ 2 críticos
How we find out where the energy went.
From the cycle production target to observed energy, the Cascade opens the loss across three levels: executive, tactical and operational, all the way to the asset that caused it. Watch the walkthrough or click it yourself.
Click any slice to open level 2
Level 2 · Tactical · downtime broken down (-57 MWh)
Level 3 · Operational · the cause of each one
Plant faults, by the asset that caused them
This is where maintenance stops being an opinion and becomes a calculated priority.
The executive level shows the cycle deviation. The tactical level splits downtime between internal and external. The operational level reaches the equipment that burdened generation: this is where maintenance stops being an opinion and becomes a calculated priority.
Monitoring that already carries operational context.
Every supervisory system shows the now. Zyron explains the accumulated:
where the loss happened, which inverter underperforms and what to do about it.
Actual vs expected generation
Compares production with the asset potential considering irradiance and real conditions. The deviation shows up right away, not in next month's report.
PR per IEC 61724-1
Performance ratio with temperature correction, loss breakdown cascade and comparison between inverters in the same group.
Curtailment and energy availability
Separates time availability from energy availability. You know when the plant is down and when it is curtailed by dispatch.
Alarms with criticality
Events prioritized by generation impact, not an endless list of identical notifications.
The whole balance of plant
Tracker, string box, skid, substation and grid. The tracker that lost its target shows up before it becomes generation loss.
Portfolio view
Every plant on one screen, with deviations ranked by impact. Multi-brand, regardless of inverter manufacturer.
Agnostic at the inverter. Proprietary across the rest of the plant.
Your portal sees the inverter. And the rest of the plant, who measures it?
Trion hardware covers what the inverter does not deliver, without replacing the infrastructure already in the field.
Electrical quantities and power quality, sending over MQTT via 2G, 3G or Ethernet.
Covers what the inverter cannot seeMain switchboard, transformer, generation versus injection.
Modbus RS485 and TCP/IP gateway with remote actuation.
Covers what the inverter cannot seeString box, protection relay, MV breaker, tracker, weather station.
Plant generation, in real time, in the palm of your hand.
The portfolio does not wait for you to reach your desk. The SCADA app shows power now, the day curve against irradiance and the weekly and monthly totals, with critical alarms arriving as notifications.
Zyron SCADA
Trion I Solar Plant ·● online
Why this is not just a reading panel.
A generic SCADA collects and displays. At Zyron, the data does not die on the screen.
With SCADA + CMMS together, the generation deviation automatically opens a service request, already classified by criticality, and lands in the planning queue. See combined plans →
SCADA as a module.
It can be taken standalone or combined with the CMMS. Licensed per registered site, with a tier based on plant size and users already included in the plan.
Monthly or annual payment
Standard
Size guidance: plants from 500 kW to 999 kW
R$ 749/mês
Up to 5 users included
Users included in the site subscription
Licensed per registered site · the tier follows the data acquisition capability
Ask for the setup and onboarding fee for your project.
- Real-time monitoring
- Supervisory system with unified or segmented portfolio
- Alarm panel
- Operations center (Zyron framework: Cockpit, requests, work orders)
- 2D synoptic
Business
Size guidance: plants from 1 MW
R$ 1.499/mês
Up to 10 users included
Users included in the site subscription
Licensed per registered site · the tier follows the data acquisition capability
Ask for the setup and onboarding fee for your project.
- Real-time monitoring
- Supervisory system with unified or segmented portfolio
- Alarm panel
- Operations center (Zyron framework: Cockpit, requests, work orders)
- 2D synoptic
- Remote control (breaker commands)
- Weather data API
- Performance management (KPI)
Enterprise
Size guidance: distributed and utility-scale portfolios
on request
Users sized on request
Users included in the site subscription
Licensed per registered site · the tier follows the data acquisition capability
Ask for the setup and onboarding fee for your project.
- Real-time monitoring
- Supervisory system with unified or segmented portfolio
- Alarm panel
- Operations center (Zyron framework: Cockpit, requests, work orders)
- 2D synoptic
- Remote control (breaker commands)
- Weather data API
- Performance management (KPI)
- 3D synoptic
- Operation financial management (P&L)
Progressive discount based on the number of sites contracted.
Ask the sales team about the tiers
Discount on the lower-priced module fee.
Progressive discount based on the number of sites contracted.
What would it cost for your operation?
Tell us sites, average capacity, modules and technicians. Your simulation arrives by e-mail or WhatsApp.
SCADA is billed per registered site, with users already included in the subscription: up to 5 on Standard and up to 10 on Business.
An integrator with plants up to 500 kW? Discover the Soft plan →
See SCADA with your own plant on screen.
In the demo we connect one of your plants and you see actual against expected generation. The 21 day free trial is for the CMMS.