Most "CMMS" are just a button to open a ticket.
Ours is full asset management.
Asset tree, calculated criticality, preventive plan and execution visibility. Designed from scratch for solar O&M, not adapted from industry.
Book a CMMS demo →From the Operations Center to the 52-week calendar.
Product screen structure, with anonymized data. The request is born classified, the tree organizes the asset and the calendar distributes the plan.
Operations Center triage
1 h 17
identify · analyze · open request
elapsed 1h17 · above the 30 min target
Triagem PCM
28 min
receive · analyze · open work order
elapsed 14h28 · adjusted 14h00 (day rollover)
SLA acordado
2 h 40
request opened → on site start
elapsed 16h03 · adjusted 13h23 · target 72h · met
TMR
2 h 35
field repair
5 inverters · cleaning and retorque
MTTR
20 h 10
asset stop → return
elapsed time · no adjustment
Adjusted by working window · Operations Center 6am-6pm · Planning 8am-6pm · Field team 7am-5pm · MTTR without adjustment is what feeds availability
78
SS abertas
awaiting triage or execution
9
Active critical
4 h SLA running
37
Equipment down
with declared generation loss
67%
Request to work order conversion
in the period · 62% in the previous one
Por status
Emergency jobs by criticality
By requesting area
What changes when the CMMS is built for solar.
| Criterion | "CMMS" that only opens tickets | Generic industrial CMMS | Zyron · built for renewables |
|---|---|---|---|
| Asset structure | None. A loose list of tickets | Industrial hierarchy (production line) | Solar tree with up to 7 levels, from site to string |
| Criticality | Does not exist | Generic, per equipment | Calculated from generation loss, never chosen |
| Preventive plan | Nonexistent or manual | Based on machine time and usage | 52 weeks: cleaning, thermography and inspection on the solar calendar |
| Indicators | Typed in, when they exist | Partially derived | None typed in: six milestones, five intervals |
| Traceability | Zero. The ticket closes and disappears | Exists, outside the solar context | History per asset that supports decisions and audits |
| Execution visibility | Does not see the field | Focused on the shop floor | From the technician's route to the manager's dashboard |
| Origin | Generic, multi-purpose | Born in heavy industry | Born inside a real solar operation |
The alarm solves nothing. The work order does.
The five planning stages applied to solar energy. Each stage feeds the next with data, and every handover leaves a time milestone on record.
The deviation shows up before the call.
The supervisory system reads generation and the balance of plant all the time. When the curve drifts from expected, the Operations Center opens the failure record and logs milestone T0. Nobody has to notice the problem at the end of the shift.
The failure becomes a record the minute it happens, not in next month's report.
Failure record catalog and troubleshooting checklist from the Operations Center.
"A typed indicator is an opinion. A derived indicator is an audit trail."
End-to-end maintenance management.
Global asset tree
Up to 7 levels, from site to string: plant, skid, inverter, string box, string, module. Multi-tenant across three levels.
Calculated criticality
There is no manual criticality field on emergency requests. Calculated loss defines criticality and SLA. It is the hardest argument to copy.
Six milestones, zero typing
T0 to T5: Operations Center triage, planning triage, agreed SLA, repair time and MTTR all come from the milestones. A typed indicator is an opinion; a derived one is an audit trail.
52-week preventive plan
Cleaning, thermography and inspection on the calendar, no improvisation. Three or more recurrences in 90 days opens a failure analysis with 5W2H.
Offline field app
The technician executes along the route, with a digital checklist and photo evidence. Works with no signal.
From budget to invoice
Requests with budget approval, segregation of duties (whoever builds it does not approve it) and measurement bulletin through to invoicing.
The daily route in the technician's pocket.
The field does not open a laptop. Zyron's field app delivers the schedule, guides execution with a checklist and photo evidence, and records the time milestones without anyone typing.
Hello, field technician
Southeast team 1 · Norte I PV Plant
Who operates, who plans and who answers for the contract.
A CMMS that only serves the manager will not be used by the field. And without the field recording, there is no history.
Maintenance manager
See the whole operation without asking anyone for a report
- Backlog, MTTR and SLA per contract in real time
- Maintenance cost per asset and per plant
- Recurrences that require failure analysis
Planner
A plan that survives contact with reality
- 52-week preventive plan on the solar calendar
- Criticality matrix that prioritizes by generation loss
- Budget with segregation of duties and approval
Scheduler
Distribute work across the team you have, not the ideal one
- Real crew capacity and optimized routes
- Agreed SLA read by the system, not from memory
- Rescheduling without redoing the whole week
Field technician
Solve it at the plant without depending on signal
- Daily route with a digital checklist on the phone
- Risk assessment signed electronically before climbing the asset
- Offline app that syncs when the network returns
CMMS as a module.
It can be taken standalone or combined with SCADA. Licensed per registered site, with technical users starting from the plan minimum and requesters always unlimited and free.
Monthly or annual payment
Standard
Size guidance: plants from 500 kW to 999 kW
R$ 299/mês
Minimum of 3 technical users
+ R$ 100 per technical user
Site subscription plus the fee per technical user · unlimited free requesters
Licensed per registered site · the tier follows the data acquisition capability
Ask for the setup and onboarding fee for your project.
- Multi-client structure for providers and integrators
- Anomaly and SLA management (requests, work orders)
- Inventory control
- Budget preparation
- Asset tree and criticality matrix
- Preventive maintenance plan (52 weeks)
- Measurement bulletin
- Contract management
- Report engine (maintenance, technical tests)
Business
Size guidance: plants from 1 MW
R$ 499/mês
Minimum of 5 technical users
+ R$ 100 per technical user
Site subscription plus the fee per technical user · unlimited free requesters
Licensed per registered site · the tier follows the data acquisition capability
Ask for the setup and onboarding fee for your project.
- Multi-client structure for providers and integrators
- Anomaly and SLA management (requests, work orders)
- Inventory control
- Budget preparation
- Asset tree and criticality matrix
- Preventive maintenance plan (52 weeks)
- Measurement bulletin
- Contract management
- Report engine (maintenance, technical tests)
- Logistics management
- Intelligent field technician management
- Health and safety module (risk assessment, permits, briefings)
Enterprise
Size guidance: distributed and utility-scale portfolios
on request
Users sized on request
Site subscription plus the fee per technical user · unlimited free requesters
Licensed per registered site · the tier follows the data acquisition capability
Ask for the setup and onboarding fee for your project.
- Multi-client structure for providers and integrators
- Anomaly and SLA management (requests, work orders)
- Inventory control
- Budget preparation
- Asset tree and criticality matrix
- Preventive maintenance plan (52 weeks)
- Measurement bulletin
- Contract management
- Report engine (maintenance, technical tests)
- Logistics management
- Intelligent field technician management
- Health and safety module (risk assessment, permits, briefings)
- Intelligent spare parts management
- Maintenance financial management (P&L)
Progressive discount based on the number of sites contracted.
Ask the sales team about the tiers
Discount on the lower-priced module fee.
Progressive discount based on the number of sites contracted.
What would it cost for your operation?
Tell us sites, average capacity, modules and technicians. Your simulation arrives by e-mail or WhatsApp.
The CMMS adds two components: the subscription per registered site plus a fee per technical user, starting from each plan's minimum. Requesters are unlimited and free on every plan: whoever asks for service never pays.
An integrator with plants up to 500 kW? Discover the Soft plan →
With CMMS + SCADA together, the service request is born from the detected generation deviation, classified by criticality, and the per-site fee of the lower-priced module comes with a discount, capped in the proposal.
Try the CMMS for 21 days, no card.
We build the asset tree of one of your plants, apply the criticality matrix and open a work order together with your team.
Free 21-day CMMS trial →